Digital Wireline Logs for Black Stump 4
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Black Stump 4 in the Eromanga, Queensland, operated by OCA, drilled to a total depth of 1,711 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,711 m
- Datum Elevation
- 158.3 m
- Spud Date
- 13/11/1998
- Completion Date
- 24/11/1998
- Permit
- -
- Rig
- Rig 18
Location
- Latitude
- -26.6403
- Longitude
- 143.3040