Digital Wireline Logs for Gilberton 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Gilberton 2 in the Eromanga, Queensland, operated by BMR, drilled to a total depth of 244 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 244 m
- Datum Elevation
- -
- Spud Date
- -
- Completion Date
- 04/12/69
- Permit
- -
- Rig
- -
Location
- Latitude
- -19.8500
- Longitude
- 142.8080