Skip to content

Hammond 1

Eromanga, Queensland

Hammond 1 is a petroleum well in the Eromanga, Queensland, operated by Delhi, drilled to a total depth of 2,642 m.

Request LAS Files & Well Summary

Well Information

Well Name
Hammond 1
Basin
Eromanga
State
Queensland
Classification
NEST
Operator
Delhi
Driller
S & T

Drilling Data

Total Depth
2,642 m
Datum Elevation
135.9 m
Spud Date
15/09/1984
Completion Date
12/10/1984
Permit
-

Location

Latitude
-25.3256
Longitude
142.8440

Available Log Data

1
Log Streams
8
Curves
131,286
Data Points
20,008
Metres

Caliper (1 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALI 173 m 2640 m 2466 m

GR (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR 12 m 2631 m 2619 m

Miscellaneous (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPTH 12 m 2640 m 2628 m

Resistivity (3 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
LLD 175 m 2637 m 2461 m
LLS 175 m 2637 m 2461 m
MSFL 175 m 2634 m 2459 m

Sonic (1 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 173 m 2639 m 2465 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 175 m 2620 m 2445 m