Digital Wireline Logs for North Apsley 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for North Apsley 1 in the Eromanga, Queensland, operated by Hunt, drilled to a total depth of 1,596 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,596 m
- Datum Elevation
- -
- Spud Date
- 05/03/98
- Completion Date
- 22/03/98
- Permit
- EPP578
- Rig
- -
Location
- Latitude
- -22.3739
- Longitude
- 143.3780