Digital Wireline Logs for Saratoga 1 - Ero
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Saratoga 1 - Ero in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 2,776 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,776 m
- Datum Elevation
- 113.0 m
- Spud Date
- 29/08/2005
- Completion Date
- 17/09/2005
- Permit
- ATP 259 P
- Rig
- Rig 30
Location
- Latitude
- -26.8972
- Longitude
- 141.2430