Digital Wireline Logs for Stonehenge 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Stonehenge 1 in the Eromanga, Queensland, operated by Lasmo, drilled to a total depth of 1,683 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,683 m
- Datum Elevation
- -
- Spud Date
- 06/12/88
- Completion Date
- 21/12/88
- Permit
- EPP268
- Rig
- -
Location
- Latitude
- -23.9725
- Longitude
- 143.1900