Digital Wireline Logs for Talgeberry 8
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Talgeberry 8 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 1,331 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,331 m
- Datum Elevation
- 191.4 m
- Spud Date
- 23/10/2003
- Completion Date
- 29/10/2003
- Permit
- ATP 299 P
- Rig
- Rig 34
Location
- Latitude
- -26.9500
- Longitude
- 143.4330