Digital Wireline Logs for Tambo GSQ 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Tambo GSQ 1 in the Eromanga, Queensland, operated by GSQ, drilled to a total depth of 809 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 809 m
- Datum Elevation
- -
- Spud Date
- 20/05/1973
- Completion Date
- 01/08/1973
- Permit
- -
- Rig
- Joy 45
Location
- Latitude
- -24.8500
- Longitude
- 146.3670