Digital Wireline Logs for Thungo 7
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Thungo 7 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 1,096 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,096 m
- Datum Elevation
- 111.6 m
- Spud Date
- 11/06/2002
- Completion Date
- 17/06/2002
- Permit
- PL 51
- Rig
- Rig 18
Location
- Latitude
- -27.7218
- Longitude
- 142.5820