Digital Wireline Logs for Thungo 8
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Thungo 8 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 1,118 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,118 m
- Datum Elevation
- -
- Spud Date
- 01/10/2003
- Completion Date
- 06/10/2003
- Permit
- PL 51
- Rig
- Rig 34
Location
- Latitude
- -27.7192
- Longitude
- 142.5850