Digital Wireline Logs for Blythdale North 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Blythdale North 2 in the Surat, Queensland, operated by Santos, drilled to a total depth of 747 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 747 m
- Datum Elevation
- 317.5 m
- Spud Date
- 08/11/2006
- Completion Date
- 22/11/2006
- Permit
- PL 5
- Rig
- Rig 105
Location
- Latitude
- -26.5305
- Longitude
- 148.9450