Digital Wireline Logs for Fairview 17
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Fairview 17 in the Surat, Queensland, operated by Tri Star, drilled to a total depth of 715 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 715 m
- Datum Elevation
- -
- Spud Date
- 22/09/1996
- Completion Date
- 10/10/1996
- Permit
- PL 91
- Rig
- -
Location
- Latitude
- -25.6167
- Longitude
- 148.9370