Digital Wireline Logs for Fairview 25
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Fairview 25 in the Surat, Queensland, operated by Tri Star, drilled to a total depth of 791 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 791 m
- Datum Elevation
- -
- Spud Date
- 19/03/1999
- Completion Date
- 03/08/1999
- Permit
- PL 91
- Rig
- -
Location
- Latitude
- -25.6064
- Longitude
- 148.9760