Digital Wireline Logs for Fairview 41
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Fairview 41 in the Surat, Queensland, operated by Tri Star, drilled to a total depth of 643 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 643 m
- Datum Elevation
- -
- Spud Date
- 09/09/2001
- Completion Date
- 11/10/2001
- Permit
- PL 92
- Rig
- -
Location
- Latitude
- -25.6856
- Longitude
- 148.8730