Digital Wireline Logs for New Royal 6
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for New Royal 6 in the Surat, Queensland, operated by Boral, drilled to a total depth of 1,555 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,555 m
- Datum Elevation
- 274.1 m
- Spud Date
- 03/09/1999
- Completion Date
- 09/09/1999
- Permit
- PL 22
- Rig
- Rig 1
Location
- Latitude
- -27.0937
- Longitude
- 148.8560