Digital Wireline Logs for New Royal 8
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for New Royal 8 in the Surat, Queensland, operated by OCA, drilled to a total depth of 1,531 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,531 m
- Datum Elevation
- 268.0 m
- Spud Date
- 04/11/2001
- Completion Date
- 16/11/2001
- Permit
- PL 22
- Rig
- Mitchell Rig 150
Location
- Latitude
- -27.1005
- Longitude
- 148.8690