Digital Wireline Logs for Newstead 9
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Newstead 9 in the Surat, Queensland, operated by OCA, drilled to a total depth of 1,493 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,493 m
- Datum Elevation
- 250.2 m
- Spud Date
- 11/10/1992
- Completion Date
- 22/10/1992
- Permit
- -
- Rig
- Rig 11
Location
- Latitude
- -27.1916
- Longitude
- 148.8840