Digital Wireline Logs for Pine Ridge 8
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Pine Ridge 8 in the Surat, Queensland, operated by AAO, drilled to a total depth of 1,081 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,081 m
- Datum Elevation
- 336.8 m
- Spud Date
- 22/04/1965
- Completion Date
- 30/04/1965
- Permit
- -
Location
- Latitude
- -26.4944
- Longitude
- 148.9930