Skip to content

Six Mile 1

Surat, Queensland

Six Mile 1 is a petroleum well in the Surat, Queensland, operated by AAR, drilled to a total depth of 1,636 M.

Request LAS Files & Well Summary

Well Information

Well Name
Six Mile 1
Basin
Surat
State
Queensland
Classification
NEST
Operator
AAR
Driller
Richter

Drilling Data

Total Depth
1,636 M
Datum Elevation
317.6 m
Spud Date
28/09/1973
Completion Date
14/10/1973
Permit
PL 8

Location

Latitude
-26.6078
Longitude
149.0680

Available Log Data

1
Log Streams
10
Curves
97,329
Data Points
14,833
Metres

Caliper (1 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALI 173 m 1627 m 1454 m

GR (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR 14 m 1630 m 1615 m

Miscellaneous (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPTH 14 m 1636 m 1621 m

Mudlog (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ROP 184 m 1630 m 1446 m
TGAS 182 m 1631 m 1448 m

Resistivity (3 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
IND 182 m 1627 m 1444 m
LAT 182 m 1630 m 1448 m
SN 180 m 1625 m 1445 m

Sonic (1 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 177 m 1630 m 1453 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 181 m 1636 m 1454 m