Digital Wireline Logs for Emily 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Emily 1 in the Wemonaga, South Australia, operated by Audax, drilled to a total depth of 2,324 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,324 m
- Datum Elevation
- -
- Spud Date
- 10/12/2005
- Completion Date
- 28/12/2005
- Permit
- PEL 182
- Rig
- Rig 18
Location
- Latitude
- -26.1053
- Longitude
- 140.3160