Blinman 1
Blinman 1 is a petroleum well in the Arrowie, South Australia, operated by Frontier, drilled to a total depth of 482 m.
Well Information
Drilling Data
- Total Depth
- 482 m
- Datum Elevation
- 632.2 m
- Spud Date
- 11/10/1990
- Completion Date
- 25/10/1990
- Permit
- PEL 41
- Rig
- Rig 18
Location
- Latitude
- -31.0839
- Longitude
- 138.6420
Available Log Data
Caliper (1 curves)
Borehole diameter measurements indicating hole condition and washout zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| CALI | 90 m | 478 m | 387 m |
Density (1 curves)
Bulk density measurements for porosity calculation and lithology identification.
| Curve | Start | End | Interval |
|---|---|---|---|
| RHOB | 91 m | 475 m | 384 m |
GR (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| GR | 0 m | 475 m | 475 m |
Miscellaneous (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPTH | 0 m | 478 m | 477 m |
Neutron (1 curves)
Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.
| Curve | Start | End | Interval |
|---|---|---|---|
| NPHI | 90 m | 478 m | 387 m |
Resistivity (2 curves)
Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| LLD | 90 m | 477 m | 386 m |
| LLS | 90 m | 477 m | 386 m |
Sonic (1 curves)
Acoustic travel time logs used for porosity estimation and seismic calibration.
| Curve | Start | End | Interval |
|---|---|---|---|
| DT | 88 m | 477 m | 389 m |