Skip to content

Digital Wireline Logs for CBH 2

Ready for Instant Purchase Workstation-Ready LAS · QC'd · Composite

Arrowie, South Australia

Quality-controlled, spliced, and depth-matched wireline log data for CBH 2 in the Arrowie, South Australia, operated by Santos Ltd, drilled to a total depth of 750 m. Ready for immediate petrophysical analysis.

Request LAS Files & Well Summary

Well Information

Well Name
CBH 2
Basin
Arrowie
State
South Australia
Classification
NEMH
Operator
Santos Ltd
Driller
-

Drilling Data

Total Depth
750 m
Datum Elevation
-
Spud Date
4/08/1981
Completion Date
17/10/1981
Permit
EL 691
Rig
-

Location

Latitude
-29.5791
Longitude
139.5010