Digital Wireline Logs for Barina 8
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Barina 8 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,278 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,278 m
- Datum Elevation
- 32.9 m
- Spud Date
- 23/03/2007
- Completion Date
- 3/04/2007
- Permit
- PPL 84
- Rig
- -
Location
- Latitude
- -28.3028
- Longitude
- 139.8990