Digital Wireline Logs for Basham 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Basham 1 in the Cooper, South Australia, operated by Beach, drilled to a total depth of 1,979 M. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,979 M
- Datum Elevation
- -
- Spud Date
- 26/10/11
- Completion Date
- 07/11/11
- Permit
- PEL-91
- Rig
- Rig-30
Location
- Latitude
- -27.7377
- Longitude
- 139.3740
Comments
Preliminary Volumetric estimates indicate up to 3-5milbbls OIP