Digital Wireline Logs for Beckler 5
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Beckler 5 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 3,049 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,049 m
- Datum Elevation
- 92.0 m
- Spud Date
- 15/11/2001
- Completion Date
- 06/12/2001
- Permit
- PPL 141
- Rig
- Rig 18
Location
- Latitude
- -28.0690
- Longitude
- 140.9690