Digital Wireline Logs for Bindah 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Bindah 3 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 3,040 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,040 m
- Datum Elevation
- 44.8 m
- Spud Date
- 17/01/2009
- Completion Date
- 6/02/2009
- Permit
- PPL 124
- Rig
- -
Location
- Latitude
- -27.8195
- Longitude
- 140.0680