Digital Wireline Logs for Bobs Well 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Bobs Well 2 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,893 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,893 m
- Datum Elevation
- 42.6 m
- Spud Date
- 18/09/2009
- Completion Date
- 13/10/2009
- Permit
- PPL 89
- Rig
- -
Location
- Latitude
- -28.3598
- Longitude
- 140.1100