Digital Wireline Logs for Bow 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Bow 1 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 3,054 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,054 m
- Datum Elevation
- 83.6 m
- Spud Date
- 10/10/2000
- Completion Date
- 02/11/2000
- Permit
- PPL 141
- Rig
- Rig 3
Location
- Latitude
- -28.0179
- Longitude
- 140.9740