Digital Wireline Logs for Bow 2
Quote within 1 business day
Priced per curve-metre, capped at $2,000 per well
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Bow 2 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 3,034 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,034 m
- Datum Elevation
- 85.1 m
- Spud Date
- 26/09/2001
- Completion Date
- 17/10/2001
- Permit
- PPL 141
- Rig
- Rig 18
Location
- Latitude
- -28.0274
- Longitude
- 140.9730