Digital Wireline Logs for Coopers Creek 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Coopers Creek 3 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,924 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,924 m
- Datum Elevation
- 35.0 m
- Spud Date
- 02/01/2002
- Completion Date
- 20/01/2002
- Permit
- PPL 68
- Rig
- Rig 3
Location
- Latitude
- -27.8047
- Longitude
- 140.0200