Digital Wireline Logs for Crows Nest 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Crows Nest 3 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,762 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,762 m
- Datum Elevation
- 92.0 m
- Spud Date
- 01/12/2002
- Completion Date
- 24/12/2002
- Permit
- PPL 141
- Rig
- Rig 18
Location
- Latitude
- -28.0226
- Longitude
- 140.9080