Digital Wireline Logs for Dullingari North 10
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Dullingari North 10 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,822 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,822 m
- Datum Elevation
- 83.0 m
- Spud Date
- 24/12/2000
- Completion Date
- 11/01/2001
- Permit
- PPL 12
- Rig
- Rig 18
Location
- Latitude
- -28.0586
- Longitude
- 140.8730