Dullingari North 13
Workstation-Ready Wireline Logs (LAS) & Data Summaries
Quality-controlled, spliced, and depth-matched wireline log data for Dullingari North 13 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,776 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,776 m
- Datum Elevation
- 81.1 m
- Spud Date
- 01/03/2001
- Completion Date
- 30/03/2001
- Permit
- PPL 12
- Rig
- Rig 18
Location
- Latitude
- -28.0773
- Longitude
- 140.8800