Digital Wireline Logs for Dullingari North 19
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Dullingari North 19 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,636 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,636 m
- Datum Elevation
- 94.5 m
- Spud Date
- 28/07/2003
- Completion Date
- 21/08/2003
- Permit
- PPL 141
- Rig
- Rig 18
Location
- Latitude
- -28.0431
- Longitude
- 140.8850