Skip to content

Digital Wireline Logs for Dullingari North 18

Ready for Instant Purchase Workstation-Ready LAS · QC'd · Composite

Cooper, South Australia

Quality-controlled, spliced, and depth-matched wireline log data for Dullingari North 18 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,784 m. Ready for immediate petrophysical analysis.

Request LAS Files & Well Summary

Well Information

Well Name
Dullingari North 18
Basin
Cooper
State
South Australia
Classification
NDOD
Operator
Santos
Driller
ODE

Drilling Data

Total Depth
2,784 m
Datum Elevation
93.0 m
Spud Date
06/07/2002
Completion Date
28/07/2002
Permit
PPL 141
Rig
Rig 18

Location

Latitude
-28.0302
Longitude
140.9140