Digital Wireline Logs for Jasmin 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Jasmin 1 in the Cooper, South Australia, operated by Eagle Bay, drilled to a total depth of 2,450 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,450 m
- Datum Elevation
- 36.1 m
- Spud Date
- 21/11/2007
- Completion Date
- 07/12/2007
- Permit
- PEL 182
- Rig
- Rig 3
Location
- Latitude
- -27.3991
- Longitude
- 139.8880