Digital Wireline Logs for Kanowana 7
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Kanowana 7 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 3,144 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,144 m
- Datum Elevation
- 38.6 m
- Spud Date
- 25/12/2008
- Completion Date
- 12/01/2009
- Permit
- PPL 28
- Rig
- -
Location
- Latitude
- -27.7961
- Longitude
- 139.9760