Digital Wireline Logs for Kidman 9
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Kidman 9 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,317 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,317 m
- Datum Elevation
- 77.0 m
- Spud Date
- 08/01/1997
- Completion Date
- 30/01/1997
- Permit
- -
- Rig
- Rig 21
Location
- Latitude
- -28.2333
- Longitude
- 140.8170