Skip to content

Kopi 1

Cooper, South Australia

Kopi 1 is a petroleum well in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,627 m.

Request LAS Files & Well Summary

Well Information

Well Name
Kopi 1
Basin
Cooper
State
South Australia
Classification
NEST
Operator
Santos
Driller
ODE

Drilling Data

Total Depth
2,627 m
Datum Elevation
40.0 m
Spud Date
27/11/1990
Completion Date
16/12/1990
Permit
-
Rig
Rig 23

Location

Latitude
-28.4392
Longitude
140.1120

Available Log Data

1
Log Streams
13
Curves
176,215
Data Points
26,855
Metres

Caliper (1 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALS 566 m 2607 m 2040 m

Chromato (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
MTEM 566 m 2626 m 2059 m

GR (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR 28 m 2600 m 2571 m

Miscellaneous (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPTH 28 m 2626 m 2598 m

Resistivity (4 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
LLD 570 m 2608 m 2037 m
LLS 570 m 2608 m 2037 m
MRES 566 m 2626 m 2059 m
MSFL 1411 m 2608 m 1196 m

Sonic (4 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 566 m 2621 m 2054 m
DTL 566 m 2621 m 2054 m
DTLF 566 m 2626 m 2059 m
DTLN 566 m 2626 m 2059 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 570 m 2595 m 2024 m