Skip to content

Merinda 1

Cooper, South Australia

Merinda 1 is a petroleum well in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,681 m.

Request LAS Files & Well Summary

Well Information

Well Name
Merinda 1
Basin
Cooper
State
South Australia
Classification
NESS
Operator
Santos
Driller
ODE

Drilling Data

Total Depth
2,681 m
Datum Elevation
32.0 m
Spud Date
03/11/1987
Completion Date
-
Permit
-
Rig
Rig 12

Location

Latitude
-28.4478
Longitude
140.1830

Available Log Data

1
Log Streams
14
Curves
217,678
Data Points
33,174
Metres

Caliper (1 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALI 300 m 2668 m 2368 m

GR (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR 0 m 2670 m 2669 m

Logging Parameters (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
TENS 0 m 2688 m 2688 m

Miscellaneous (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPTH 0 m 2688 m 2688 m

Resistivity (3 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
LLD 302 m 2674 m 2371 m
LLS 302 m 2674 m 2371 m
MSFL 1306 m 2664 m 1357 m

Sonic (6 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 302 m 2682 m 2379 m
DTL 302 m 2682 m 2379 m
TT1 302 m 2688 m 2385 m
TT2 302 m 2688 m 2385 m
TT3 302 m 2688 m 2385 m
TT4 302 m 2688 m 2385 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 302 m 2658 m 2355 m