Digital Wireline Logs for Merrimelia 38
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Merrimelia 38 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 1,947 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,947 m
- Datum Elevation
- 39.0 m
- Spud Date
- 31/05/1997
- Completion Date
- 12/06/1997
- Permit
- PEL 5_6
- Rig
- Rig 18
Location
- Latitude
- -27.7367
- Longitude
- 140.1800