Digital Wireline Logs for Milluna 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Milluna 3 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,374 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,374 m
- Datum Elevation
- 34.1 m
- Spud Date
- 05/11/2000
- Completion Date
- 16/11/2000
- Permit
- PPL 139
- Rig
- Rig 3
Location
- Latitude
- -28.3406
- Longitude
- 140.4680