Digital Wireline Logs for Moolion East 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Moolion East 1 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 3,236 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,236 m
- Datum Elevation
- 58.8 m
- Spud Date
- 21/12/1998
- Completion Date
- 14/01/1999
- Permit
- PEL 5/6 Murta
- Rig
- Rig 27
Location
- Latitude
- -27.3871
- Longitude
- 140.2790