Digital Wireline Logs for Moomba 177
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Moomba 177 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,401 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,401 m
- Datum Elevation
- 40.4 m
- Spud Date
- 1/03/2007
- Completion Date
- 7/05/2007
- Permit
- PPL 9
- Rig
- -
Location
- Latitude
- -28.1444
- Longitude
- 140.2600