Digital Wireline Logs for Moomba 18H
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Moomba 18H in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,764 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,764 m
- Datum Elevation
- 37.8 m
- Spud Date
- 25/02/1996
- Completion Date
- 13/04/1996
- Permit
- -
- Rig
- -
Location
- Latitude
- -28.2092
- Longitude
- 140.1820