Digital Wireline Logs for Moomba 125
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Moomba 125 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,784 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,784 m
- Datum Elevation
- 36.0 m
- Spud Date
- 14/12/2000
- Completion Date
- 27/12/2000
- Permit
- PPL 7
- Rig
- OD & E Rig 32
Location
- Latitude
- -28.0220
- Longitude
- 140.1460