Digital Wireline Logs for Moomba 154
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Moomba 154 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,597 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,597 m
- Datum Elevation
- 36.4 m
- Spud Date
- 17/01/2002
- Completion Date
- 01/02/2002
- Permit
- PPL 7
- Rig
- Rig 18
Location
- Latitude
- -28.0550
- Longitude
- 140.1880