Digital Wireline Logs for Moomba 166
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Moomba 166 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,533 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,533 m
- Datum Elevation
- 36.8 m
- Spud Date
- 14/06/2003
- Completion Date
- 08/07/2003
- Permit
- PPL 8
- Rig
- Rig 18
Location
- Latitude
- -28.1421
- Longitude
- 140.1640