Digital Wireline Logs for Moomba 85
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Moomba 85 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 3,156 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,156 m
- Datum Elevation
- 40.0 m
- Spud Date
- 12/02/1997
- Completion Date
- 20/03/1997
- Permit
- PPL 9
- Rig
- Rig 23
Location
- Latitude
- -28.2290
- Longitude
- 140.2020