Digital Wireline Logs for Moomba 95
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Moomba 95 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,623 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,623 m
- Datum Elevation
- 37.0 m
- Spud Date
- 9/04/1998
- Completion Date
- 5/05/1998
- Permit
- PPL 8
- Rig
- -
Location
- Latitude
- -28.1428
- Longitude
- 140.1660